Home Services Maintenance Planning

Maintenance Planning

Maintenance planning, scheduling, and backlog management that maximizes wrench time and eliminates reactive firefighting.

55-65%Target Wrench Time Percentage
30-40%More Work Completed with Same Headcount
3-4 wkTarget Backlog Level
90%+Target Schedule Compliance

What Is Maintenance Planning and Scheduling?

Maintenance planning and scheduling is the discipline of organizing maintenance work so that every job is executed safely, efficiently, and with minimal disruption to production. It encompasses everything from defining the steps required to complete a repair, to coordinating equipment access with operations, to sequencing the weekly work schedule so that the right crafts arrive at the right asset with the right parts and the right procedures at the right time.

The distinction between planning and scheduling is important because they are separate functions that require different skills and different timing. Planning answers the question “how should this work be done?” A planner develops a job plan that specifies the work steps in sequence, identifies the parts and materials required, lists the tools and specialty equipment needed, estimates the labor hours by craft, defines the safety requirements including permits and lockout/tagout procedures, and references any applicable technical documentation such as OEM manuals or engineering drawings. A well-developed job plan eliminates the delays that occur when a technician arrives at an asset and must figure out what to do, search for parts, make trips to the tool crib, or wait for information.

Scheduling answers the question “when should this work be done and by whom?” A scheduler takes the planned jobs that are ready for execution — meaning all parts are staged, permits are pre-arranged, and operations has committed to releasing the equipment — and allocates them against available labor hours for the coming week. The weekly schedule balances workload across crafts, sequences jobs to minimize production impact, and builds in a buffer for the inevitable emergent work that will arise during execution.

The two functions operate on different time horizons. Planning works two to four weeks ahead of execution, providing enough lead time for parts procurement, material kitting and staging, and coordination with engineering or external contractors. Scheduling works one week ahead, finalizing the allocation of labor to specific jobs on specific days based on confirmed equipment availability and updated craft availability. Daily scheduling adjustments account for emergent work, weather disruptions, absenteeism, and priority changes that arise during the execution week.

Without formal planning and scheduling, maintenance organizations default to a reactive cycle that is costly and self-perpetuating. Technicians spend the majority of their shift on non-wrench-time activities: walking to and from jobs, searching for parts, waiting for equipment access, locating tools, reading drawings, and clarifying work scope. Industry benchmarks from the Maintenance Planning and Scheduling Handbook and studies by the Marshall Institute consistently show that unplanned maintenance work achieves wrench time — the percentage of the shift a technician spends physically performing maintenance tasks — of only 25-35%. Planned and scheduled work routinely achieves 55-65% wrench time. That difference means a facility with 20 maintenance technicians effectively gains the equivalent of 6-8 additional full-time craft workers without hiring anyone — simply by eliminating the waste embedded in unplanned work execution.

Unplanned maintenance work achieves wrench time of only 25-35%. Planned and scheduled work routinely achieves 55-65% — effectively doubling the productive output of the existing workforce.


What Are the Signs Your Facility Needs Maintenance Planning and Scheduling Services?

Many facilities operate with some version of a planning and scheduling process, but the gap between what exists on paper and what actually functions in practice is often significant. The following indicators signal that the current planning and scheduling process is either absent, immature, or broken:

  • Wrench time is below 40%. If a work sampling study or reasonable estimate shows that technicians spend less than 40% of their shift actively working on equipment, the root cause is almost always inadequate planning. The remaining time is consumed by travel, delays, waiting, and rework — all of which a functioning planning process directly reduces.
  • More than 40% of weekly work is unplanned or emergent. Every facility will have some reactive work. But when emergent work consistently exceeds 30-40% of total labor hours, it indicates that the planned schedule is not being protected, that PM programs are not preventing failures effectively, or that work is being classified as “emergency” to bypass the scheduling process.
  • Schedule compliance is below 80% or is not measured at all. Schedule compliance — the percentage of scheduled work orders completed during the scheduled week — is the primary metric for scheduling effectiveness. World-class facilities sustain 90% or higher. If your facility does not track this metric, or tracks it and consistently falls below 80%, the scheduling process is not functioning as a reliable commitment between maintenance and operations.
  • Parts are frequently unavailable when work begins. If technicians regularly arrive at a job to discover that the required parts are not on-site, not staged, or were consumed on a different job, the planning process is not performing materials identification and kitting. This single failure mode can reduce wrench time by 15-20% on its own.
  • Work orders lack defined scope, steps, or labor estimates. If the typical work order consists of a one-line description — “Fix pump” or “Repair leak” — the maintenance organization has a work notification system, not a planning process. Without defined job scope, technicians must diagnose, plan, and execute on the fly, which multiplies job duration by a factor of 2-3x compared to pre-planned work.
  • The maintenance backlog is unknown, growing uncontrollably, or not managed. A healthy backlog of identified and planned work represents 4-6 weeks of available labor hours. If the backlog is undefined, contains hundreds of aged work orders that will never be executed, or is growing faster than work is being completed, the planning and backlog management process has failed.
  • Planners spend most of their time expediting parts or supervising technicians. This is the most common corruption of the planner role. Planners who are pulled into daily execution activities — filling in as supervisors, chasing emergency parts, attending every breakdown — cannot perform the advance planning work that prevents the next wave of problems. The planner role requires protection from the day-to-day pressure of reactive work.
  • Operations and maintenance are in constant conflict over equipment access. When every maintenance window is a negotiation and production routinely cancels scheduled maintenance at the last minute, the weekly scheduling process has not established the trust, communication cadence, or organizational accountability needed to function.

Our Maintenance Planning and Scheduling Approach

Our approach to maintenance planning and scheduling recognizes that tools, templates, and software are the easiest parts of the problem. The hard part is changing the daily behaviors of planners, supervisors, technicians, and operations coordinators — and sustaining those changes after the consultants leave. Every element of our methodology is designed to build internal capability that the facility owns and operates independently.

Job Plan Development

We build the job plan library starting with the work that matters most. Rather than attempting to create detailed plans for every conceivable job — an approach that overwhelms planners and delays the entire program — we prioritize job plans for the top 100-200 recurring work orders that account for the majority of planned labor hours. These high-frequency jobs deliver the greatest return from standardized planning because they are executed repeatedly, and every efficiency gain is multiplied across dozens or hundreds of annual executions.

Each job plan follows a structured format that includes the task sequence with step-level detail appropriate to the job complexity, a complete bill of materials with part numbers and storeroom locations, required tools and specialty equipment, craft and labor hour estimates based on historical performance and planner judgment, safety requirements including permit types and isolation procedures, and reference documents such as OEM manual sections, engineering drawings, or clearance diagrams. The level of detail scales to the job. A routine PM task on a well-understood asset requires less step-level documentation than a complex overhaul involving multiple crafts and precise tolerances.

Weekly Scheduling Process

We implement a weekly scheduling cycle built around a formal scheduling meeting between maintenance supervision and operations coordination. This meeting — typically held on Wednesday or Thursday for the following week — is the cornerstone of the planning and scheduling process because it is where the commitment is made. Operations commits to releasing specific equipment for maintenance during specific windows. Maintenance commits to completing specific work during those windows. Both sides understand that this commitment is not aspirational — it is a mutual contract that drives accountability.

The weekly schedule is built from the “ready backlog” — work orders that have been fully planned with parts kitted and staged, permits pre-arranged, and scope confirmed. Only ready work enters the weekly schedule. Work that is planned but awaiting parts or engineering information remains in the total backlog until it reaches ready status. This distinction between total backlog and ready backlog is critical because scheduling work that is not truly ready is the single most common cause of schedule breaks, technician delays, and erosion of confidence in the scheduling process.

We target scheduling labor hours at 100-110% of available capacity, recognizing that some scheduled work will break for legitimate reasons and that a fully loaded schedule minimizes idle time. The schedule is front-loaded — the most critical and most complex work is scheduled for Monday and Tuesday, with shorter-duration and more flexible work placed later in the week where it can absorb disruptions without cascading impacts.

Backlog Management

A maintenance backlog is a living portfolio of identified work that must be actively managed, not a dumping ground for every work request ever submitted. We establish backlog management practices that include regular aging analysis — work orders older than 90 days that have not advanced toward ready status are reviewed for continued relevance and either re-prioritized, reclassified, or closed. The total backlog is maintained at 4-6 weeks of available labor hours. A backlog significantly below this range indicates that work identification (inspections, operator rounds, condition monitoring findings) is insufficient. A backlog significantly above this range indicates that planning throughput, parts procurement, or craft capacity cannot keep pace with incoming work.

Parts kitting and staging alone can recover 30-60 minutes per technician per shift that would otherwise be spent on multiple storeroom trips, part searches, and verification.

Planner-to-Craftsman Ratios and Role Clarity

We staff and structure the planner role based on the industry-validated ratio of one planner for every 20-30 craft workers. This ratio provides enough planning capacity to stay 2-4 weeks ahead of execution while maintaining the quality of individual job plans. When the ratio exceeds 1:30, planners cannot keep pace with incoming work notifications, job plan quality deteriorates, and the ready backlog shrinks — triggering a return to unplanned work execution.

Equally important is role clarity. The planner is not a supervisor, not a parts expediter, and not a clerk. The planner’s job is to prepare work for future execution. This means the planner must be physically and organizationally separated from daily reactive work. We establish clear role boundaries, reporting structures, and performance metrics that protect the planner’s ability to focus on advance planning rather than being consumed by today’s emergencies.

Kitting, Staging, and Coordination

Parts kitting and staging eliminate one of the largest sources of wrench time loss. When a job is planned and the parts are procured, those parts are pulled from the storeroom, assembled into a kit, labeled with the work order number, and staged in a designated area near the work location or in a centralized kitting area. When the technician receives the job assignment, the parts are already assembled and waiting. This practice alone can recover 30-60 minutes per technician per shift that would otherwise be spent on multiple storeroom trips, part searches, and verification.

Coordination extends beyond parts to include operations preparation for equipment isolation, scaffolding and rigging pre-installation, contractor mobilization, and specialty tool reservations. The weekly schedule drives all of these coordination activities by providing a confirmed timeline that each supporting function can prepare against.

Daily Schedule Adjustments

We implement a daily scheduling meeting — typically 15-20 minutes at the start of the shift — where maintenance supervision reviews the day’s scheduled work, addresses overnight developments, and makes necessary adjustments based on emergent work that arose since the weekly schedule was set. This meeting does not recreate the weekly schedule. It makes targeted adjustments while protecting the overall weekly commitment. Emergent work is accommodated by displacing the lowest-priority scheduled work, not by abandoning the schedule entirely.


Systems and Areas Typically Covered

CMMS Configuration and Work Order Workflow

The computerized maintenance management system is the backbone of planning and scheduling. We configure work order workflows to enforce the planning and scheduling discipline — work notifications flow to planners for job plan development, planned work enters the ready backlog when parts and permits are confirmed, and the scheduler pulls from the ready backlog to build the weekly schedule. Status codes, priority classifications, and work type categorizations are standardized so that the system produces meaningful data for metrics and continuous improvement. Whether the facility uses SAP PM, IBM Maximo, Infor EAM, eMaint, or another platform, the workflow logic and data integrity requirements are the same.

Preventive Maintenance Program Integration

PM work orders are the most predictable component of the maintenance workload and should be the easiest to schedule. We review existing PM routines for completeness, task-level accuracy, and frequency appropriateness, then integrate them into the weekly scheduling process as fixed commitments. PM compliance — the percentage of PM work orders completed within their scheduled window — is tracked separately from overall schedule compliance because PM deferrals have direct consequences for equipment reliability and regulatory compliance.

Shutdown and Turnaround Planning

Major outages and turnarounds are planning and scheduling at an amplified scale. We apply the same principles — detailed job plans, materials management, resource leveling, and schedule sequencing — to shutdown work scopes that may involve hundreds of individual jobs executed across compressed timelines. The shutdown planning process begins months before the execution window, with scope freeze milestones, parts procurement tracking, contract labor coordination, and critical path scheduling that identifies the work sequences controlling the overall outage duration.

Storeroom and Materials Management

Planning and scheduling cannot function without reliable parts availability. We assess storeroom practices including min/max inventory levels, reorder point accuracy, stock-out frequency, and parts identification standards. Bill of materials accuracy within the CMMS is verified against actual equipment configurations so that planners can identify required parts without conducting field surveys for every job. Storeroom organization, including location coding and inventory accuracy targets of 95% or higher, ensures that kitted parts can be reliably found when needed.

Craft Skill and Capacity Assessment

Effective scheduling requires accurate knowledge of available craft hours by skill type. We assess craft capabilities, identify skill gaps that constrain scheduling flexibility, and recommend cross-training priorities that allow schedulers to build balanced weekly schedules without bottlenecks in specific trades. Contractor labor requirements for specialized work — such as instrument calibration, high-voltage electrical, or API-certified welding — are identified during planning so that external resources are coordinated before the scheduled execution week.


What Results Do Companies Typically See?

Maintenance planning and scheduling delivers results that are measurable within months, not years. Because the improvements target the efficiency of work execution rather than equipment design changes or capital investments, facilities begin seeing operational impact within the first 90 days of sustained implementation. The following outcomes are consistently observed across industries:

For a facility with 30 technicians averaging $45 per hour fully loaded, moving from 35% to 60% wrench time recovers approximately 22,500 productive labor hours per year — equivalent to adding 11 full-time technicians without increasing headcount.

Wrench time improvement from 25-35% to 55-65%. This is the foundational metric. By eliminating travel delays, parts searches, scope clarification, and waiting time, planned and scheduled work effectively doubles the productive output of the existing maintenance workforce. For a facility with 30 technicians averaging $45 per hour fully loaded, moving from 35% to 60% wrench time recovers approximately 22,500 productive labor hours per year — equivalent to adding 11 full-time technicians without increasing headcount.

Schedule compliance exceeding 85% within 6 months. The weekly scheduling process, once established with operations commitment, ready backlog discipline, and daily adjustment meetings, consistently produces schedule compliance rates of 85-92%. This predictability benefits not only maintenance efficiency but operations planning, because production can forecast equipment availability with confidence rather than reacting to unpredictable maintenance intrusions.

Reactive maintenance reduced from 50-70% to 20-30% of total work. As the planning and scheduling process matures and the PM program receives consistent execution, the proportion of work driven by equipment failures steadily declines. This shift frees craft labor from emergency response and makes it available for planned corrective, predictive, and improvement work — creating a virtuous cycle where reliability improves further because the workforce has the capacity to address developing issues before they become failures.

Maintenance backlog reduced to a manageable 4-6 week range. Facilities that begin with backlogs of 12 weeks, 20 weeks, or backlogs so large they have never been quantified, see their backlog shrink to a managed range as planning throughput catches up with work identification and craft capacity is applied to the highest-value work. A controlled backlog means that newly identified deficiencies are addressed within weeks rather than months or years.

Parts inventory carrying costs reduced by 10-20%. Accurate job planning with confirmed bills of materials reduces emergency parts purchases — which typically carry 15-30% cost premiums for expedited shipping — and allows procurement to consolidate orders, negotiate volume pricing, and right-size storeroom inventory levels. Emergency purchase orders as a percentage of total procurement consistently drops below 5% in mature planning organizations.

Overtime reduction of 20-40%. Reactive maintenance drives overtime because emergency repairs must be completed regardless of available straight-time hours. As the proportion of planned work increases and emergency work decreases, overtime hours decline correspondingly. For facilities spending $200,000-$500,000 annually on maintenance overtime, a 30% reduction represents significant direct cost savings.

Improved safety performance through job hazard pre-analysis. When every job is planned in advance, safety requirements are identified before the technician arrives at the work site rather than being assessed on the fly under time pressure. Permit-required work, confined space entry, energized electrical work, and elevated work are identified during planning and incorporated into the job plan. Facilities with mature planning processes consistently report lower recordable incident rates within their maintenance workforce compared to their pre-planning baseline.

Sustained improvement through metric-driven management. Planning and scheduling generates the data that enables continuous improvement. Schedule compliance trends, PM compliance rates, planning accuracy (estimated vs. actual labor hours), backlog aging, and reactive work percentage provide maintenance leadership with objective measures that identify problems, track improvement, and sustain accountability. Without planning and scheduling, most maintenance organizations operate on anecdote and opinion. With it, they operate on data.

Why it matters

Why Companies Choose Our Maintenance Planning Program

Increased Wrench Time

Planned maintenance increases productive wrench time from 25-35% to 55-65%, meaning your existing crew completes 30-40% more work without adding headcount.

Reduced Maintenance Backlog

Structured scheduling reduces backlog from 8+ weeks to a manageable 3-4 weeks, giving maintenance managers visibility and control over their work pipeline.

Better Resource Coordination

Weekly scheduling coordinates craft availability, parts staging, equipment access, and operations support so jobs are ready to execute when the crew arrives.

Higher First-Time Fix Rate

Job plans with step-by-step procedures, parts lists, and tool requirements mean technicians arrive prepared, reducing return trips, rework, and parts-waiting delays.

What we solve

Challenges We Solve

Planner-to-Technician Ratio

Effective planning requires dedicated planners at a ratio of roughly 1:15-20 technicians. Most facilities understaff planning, creating a bottleneck that undermines the entire system.

Operations Coordination

Scheduled maintenance requires operations to provide equipment access windows. Without operations buy-in and a formal scheduling process, planned work gets constantly bumped by production demands.

Transitioning from Reactive Culture

Crews accustomed to reactive work may resist structured scheduling because it changes their daily routine. The transition requires management commitment and consistent reinforcement.

The Process

How Our Maintenance Planning Process Works

Our planning and scheduling implementation follows industry best practices adapted to your team size and culture.

  1. 01

    Work Management Assessment

    We assess your current work order flow, backlog profile, parts management, and crew utilization to identify the specific bottlenecks limiting your maintenance throughput.

  2. 02

    Planner Training and Job Plan Development

    We train dedicated planners in job scoping, estimating, parts identification, and job plan writing, then build standardized job plans for your most common repeat tasks.

  3. 03

    Weekly Scheduling Process Implementation

    We implement a formal weekly scheduling process that coordinates maintenance priorities with operations access windows and resource availability.

  4. 04

    Performance Tracking and Optimization

    We track wrench time, schedule compliance, backlog age, and work order completion rates to measure progress and identify areas for continued improvement.

By Industry

Industries We Serve

Industry

Maintenance Planning and Scheduling for Chemical Processing Plants

Planning and scheduling for chemical plants coordinates maintenance with turnaround schedules, permit requirements, and PSM documentation within hazardous...

Learn More →
Industry

Maintenance Planning and Scheduling for Food and Beverage Plants

Planning and scheduling for food and beverage coordinates maintenance execution within CIP windows, sanitation schedules, and allergen changeover constraints.

Learn More →
Industry

Maintenance Planning and Scheduling for Manufacturing Facilities

Planning and scheduling for manufacturing increases wrench time from 35% to 65% by eliminating parts trips, equipment access delays, and incomplete job...

Learn More →
Industry

Maintenance Planning and Scheduling for Oil and Gas Operations

Planning and scheduling for oil and gas coordinates maintenance across remote facilities with limited staffing, shared craft resources, and turnaround...

Learn More →
Industry

Maintenance Planning and Scheduling for Power Generation Plants

Planning and scheduling for power plants optimizes planned outage execution and coordinates daily BOP maintenance with unit dispatch schedules and...

Learn More →
Industry

Maintenance Planning and Scheduling for Pulp and Paper Mills

Planning and scheduling for pulp and paper manages shut work list development, shut execution, and running maintenance coordination around continuous paper...

Learn More →
Industry

Maintenance Planning and Scheduling for Pharmaceutical Plants

Planning and scheduling for pharmaceutical plants integrates maintenance work management with GMP documentation requirements and validated environment...

Learn More →
Industry

Maintenance Planning and Scheduling for Automotive Manufacturing

Planning and scheduling for automotive plants coordinates maintenance within line stops and model changeovers across tightly coupled JIT production systems.

Learn More →
Industry

Maintenance Planning and Scheduling for Cement and Aggregates Plants

Planning and scheduling for cement plants manages kiln outage planning, running maintenance during campaigns, and pre-outage material staging for efficient...

Learn More →
Industry

Maintenance Planning and Scheduling for Industrial Refrigeration

Planning and scheduling for industrial refrigeration coordinates compressor maintenance with seasonal load profiles and PSM documentation within capacity...

Learn More →
Industry

Maintenance Planning and Scheduling for Logistics and Distribution

Planning and scheduling for distribution centers builds seasonally adjusted programs — intensive pre-peak maintenance and rapid-response protocols during...

Learn More →
Industry

Maintenance Planning and Scheduling for Mining and Minerals Operations

Planning and scheduling for mining coordinates maintenance at remote sites with limited staffing, extended parts lead times, and planned shutdown execution.

Learn More →
Industry

Maintenance Planning and Scheduling for Metals and Steel Operations

Planning and scheduling for metals and steel coordinates maintenance within furnace tap schedules, rolling campaigns, and extreme-environment work procedures.

Learn More →
Industry

Maintenance Planning and Scheduling for Plastics and Rubber Manufacturing

Planning and scheduling for plastics and rubber coordinates maintenance with product changeovers, screw and die changes, and quality-driven intervention...

Learn More →
Industry

Maintenance Planning and Scheduling for Water and Wastewater

Planning and scheduling for water and wastewater helps small teams manage maintenance across treatment plants and remote pump stations efficiently.

Learn More →

By Equipment

Equipment We Support

Equipment

Maintenance Planning for Air Compressors

Maintenance Planning programs for Air Compressors, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Bearing Systems

Maintenance Planning programs for Bearing Systems, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Belt Conveyors

Maintenance planning for belt conveyors with zone-based job plans covering belt tracking, splice inspection, idler replacement, and pulley lagging service.

Learn More →
Equipment

Maintenance Planning for Boilers

Maintenance Planning programs for Boilers, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Centrifugal Compressors

Maintenance planning for centrifugal compressors addressing dry gas seal service intervals, bundle pull job plans, and rotor balancing per API 617.

Learn More →
Equipment

Maintenance Planning for Centrifugal Fans

Maintenance planning for centrifugal fans covering impeller erosion inspection job plans, bearing housing service tasks, and vibration-based scheduling.

Learn More →
Equipment

Maintenance Planning for Centrifugal Pumps

Structured maintenance plans for centrifugal pumps covering detailed job plans, kitting lists, and scheduling optimization aligned to API 610 intervals.

Learn More →
Equipment

Maintenance Planning for Chillers & Cooling Systems

Maintenance Planning programs for Chillers & Cooling Systems, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Cooling Towers

Maintenance Planning programs for Cooling Towers, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Crushers & Mills

Maintenance Planning programs for Crushers & Mills, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for DC Motors

Maintenance planning for DC motors with structured job plans for commutator resurfacing, brush inspection schedules, and armature winding test procedures.

Learn More →
Equipment

Maintenance Planning for Dust Collection Systems

Maintenance Planning programs for Dust Collection Systems, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Extruders

Maintenance Planning programs for Extruders, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Gas Turbines

Maintenance planning for gas turbines covering hot section inspection schedules, combustion hardware service intervals, and borescope exam procedures.

Learn More →
Equipment

Maintenance Planning for Gearboxes

Maintenance planning for industrial gearboxes covering oil analysis schedules per AGMA 9005, gear tooth inspection job plans, and bearing clearance checks.

Learn More →
Equipment

Maintenance Planning for Generators

Maintenance planning for generators with job plans covering stator wedge tightness testing, rotor winding insulation assessment, and exciter service tasks.

Learn More →
Equipment

Maintenance Planning for HVAC Systems

Maintenance Planning programs for HVAC Systems, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Hydraulic Cylinders

Maintenance planning for hydraulic cylinders with job plans for seal replacement intervals, rod surface condition assessment, and bore wear inspection.

Learn More →
Equipment

Maintenance Planning for Hydraulic Systems

Maintenance planning for hydraulic systems covering ISO 4406 fluid analysis schedules, filter element replacement plans, and accumulator pre-charge checks.

Learn More →
Equipment

Maintenance Planning for Induction Motors

Maintenance planning for induction motors covering insulation resistance testing schedules, bearing lubrication job plans, and rewind trigger criteria.

Learn More →
Equipment

Maintenance Planning for Industrial Blowers

Maintenance planning for industrial blowers with structured job plans for lobe clearance checks, timing gear backlash inspection, and silencer maintenance.

Learn More →
Equipment

Maintenance Planning for Industrial Ovens & Furnaces

Maintenance Planning programs for Industrial Ovens & Furnaces, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Industrial Refrigeration Systems

Maintenance Planning programs for Industrial Refrigeration Systems, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Industrial Robots

Maintenance Planning programs for Industrial Robots, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Injection Molding Machines

Maintenance Planning programs for Injection Molding Machines, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Lubrication Systems

Our team develops maintenance planning and scheduling for lubrication systems, targeting pump wear, filter element clogging, and related degradation...

Learn More →
Equipment

Maintenance Planning for Mixers & Agitators

Maintenance Planning programs for Mixers & Agitators, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Packaging Equipment

Maintenance Planning programs for Packaging Equipment, targeting common failure modes and degradation mechanisms.

Learn More →
Equipment

Maintenance Planning for Plate Heat Exchangers

Maintenance planning for plate heat exchangers covering gasket replacement schedules, plate inspection job plans, and frame torque closure procedures.

Learn More →
Equipment

Maintenance Planning for Positive Displacement Pumps

Comprehensive maintenance planning for positive displacement pumps with job plans covering valve inspection, packing adjustment, and dampener service.

Learn More →
Equipment

Maintenance Planning for Reciprocating Compressors

Maintenance planning for reciprocating compressors with detailed job plans for valve service, piston ring replacement, and crosshead clearance inspections.

Learn More →
Equipment

Maintenance Planning for Screw Compressors

Maintenance planning for screw compressors with detailed job plans for rotor clearance checks, oil separator element service, and bearing replacement.

Learn More →
Equipment

Maintenance Planning for Screw Conveyors

Maintenance planning for screw conveyors with job plans for flight wear measurement, hanger bearing service intervals, and trough liner inspection tasks.

Learn More →
Equipment

Maintenance Planning for Shell & Tube Heat Exchangers

Maintenance planning for shell and tube heat exchangers with job plans for tube bundle pulls, leak testing procedures, and fouling management programs.

Learn More →
Equipment

Maintenance Planning for Steam Turbines

Maintenance planning for steam turbines with job plans for blade inspection, governor system calibration, and bearing clearance verification per API 612.

Learn More →
Equipment

Maintenance Planning for Submersible Pumps

Maintenance planning for submersible pumps including condition-based pull schedules, motor insulation testing protocols, and cable inspection job plans.

Learn More →
Equipment

Maintenance Planning for Synchronous Motors

Maintenance planning for synchronous motors with detailed job plans for excitation system service, air gap eccentricity measurement, and brush replacement.

Learn More →
Equipment

Maintenance Planning for Variable Speed Drives

Maintenance planning for variable speed drives including capacitor inspection schedules, cooling system preventive maintenance, and power module service.

Learn More →
Equipment

Maintenance Planning for Vibration Monitoring Equipment

Our team develops maintenance planning and scheduling for vibration monitoring equipment, targeting sensor degradation, cable faults, and related...

Learn More →
Equipment

Maintenance Planning for Water Treatment Equipment

Maintenance Planning programs for Water Treatment Equipment, targeting common failure modes and degradation mechanisms.

Learn More →

Common Questions

FAQ

Wrench time is the percentage of a technician's day spent actively performing maintenance tasks (turning wrenches, taking measurements, making repairs). In unplanned environments, wrench time averages 25-35% — the rest is travel, waiting for parts, finding information, and coordinating access. Increasing wrench time is the single most effective way to increase maintenance output without adding staff.

Limited Availability
We onboard a limited number of new facilities each quarter. Secure your assessment slot before our current availability closes. Reserve Your Spot →

Get Started

Request a Free Reliability Assessment

Tell us about your equipment and facility. Our reliability team will review your situation and recommend a tailored reliability program — no obligation.

Free initial assessment
Response within 1 business day
No obligation or commitment

No obligation. Typical response within 24 hours.

Increase Your Maintenance Wrench Time From 35% to 65%

Increase Your Maintenance Wrench Time From 35% to 65%

Claim Your Free Assessment →